Former Masterton Hospital Demolition
Grün was part of the former Masterton Hospital project since 2020 and took over the demolition contract in early 2022.
The project involved demolishing twenty-six buildings, including a huge three-story concrete hospital block, and excavating and backfilling the extensive network of service tunnels and basements that stretched the length of the hospital's footprint.
The demolition was to be completed while ensuring the uninterrupted operation of the nearby hospital, pharmacy, and medical centre.
One of the project's notable achievements was a combined 12,000 tons of metal, timber, and concrete that were diverted from landfills and instead recycled and repurposed.
The project was completed in early 2023, and the land where the buildings once stood is now a beautiful grassy area. With exceptional management and a dedicated workforce, a testament to Grün's commitment to excellence, determination, and dedication to its clients and the local stakeholders.
We look forward to continuing to exceed expectations on similar projects.